Product tour

From first steel to handover — the whole record.

Follow a modular home through TerraFab OS. Click any stage to see what gets captured, who reviews it, and what you see from Australia.

STAGE 1 OF 6
Approved drawings & specifications QA team photographing work in progress Inspector reviewing a hold point Steel batch tags & mill certificates Modules loading at port Completed modules installed on site
STAGE 01 · BEFORE MANUFACTURE

Project setup

Your approved drawings, material specifications, compliance obligations and milestone schedule are fixed in the project record before the factory cuts steel, opening the digital chain of custody for the project. Later evidence is recorded against this baseline.

Drawing revisions version-controlled — the factory builds from the current set only
NCC, AS/NZS and declaration requirements mapped to specific hold points
Reform and jurisdiction documentation obligations mapped up front
Project participants invited into one shared workspace, with role-appropriate views

See it running in a demonstration project.

A 30-minute walkthrough through the evidence record — bring your builder, your certifier, or your bank.